We recently serviced the sprinkler system inside a Surrey based School for our fire alarm contractor client.

New measures announced include mandatory sprinkler systems and consistent wayfinding signage in all new high-rise blocks of flats over 11 metres tall.

We recently carried out Hydrant testing for our client at Canterbury Cathedral.

We carried out the strip out of the old rusting sprinkler system following the ultrasound testing of the old pipework.

We have recently completed the installation of the sprinkler system to a new build school in Salisbury.

Our standard pipework comes with a Red oxide finish, however we are also able to offer a powder coated finish in any colour.